PED FS SoilRemediation-Tegal CJ

Feasibility Study Preliminery Engineering Design: Clean up of Metal Smelting Waste, Tegal Regency, Central Java, Indonesia

Published: May 2016
Owner: ESP3
Author: John Keith, Warmadewanthi and Iswanto

Preliminery Engineering Design
Download Report
Download Appendix-1
Download Appendix-2

Report FS PollutionControl-Klaten CJ

Feasibility Study for Pollution Control from the Aren Palm Industry in Pucang Miliran and Daleman Villages, Klaten, Indonesia

Published: May 2016
Owner: ESP3
Author: COWI

Download Report
Download Appendixes

PAP FS LandfillClosure-Gas-ElectricityJatibarang CJ

Feasibility Study and Preliminery Engineering Design for Landfill Closure, Landfill Gas Collection and Electricity Generation and Distribution, Jati Barang Landfill, Semarang, Central Java Province, Indonesia

 

Project Action Plan
Published: May 2015
Owner: ESP3
Author: Q2 A/S

Download Report

PED FS LandfillClosure-Gas-ElectricityJatibarang CJ

Feasibility Study and Preliminery Engineering Design for Landfill Closure, Landfill Gas Collection and Electricity Generation and Distribution, Jati Barang Landfill, Semarang, Central Java Province, Indonesia 

 

Preliminery Engineering Design
Published: May 2015
Owner: ESP3
Author: Q2 A/S

Download Report
Download Appendixes

Report FS LandfillClosure-Gas-ElectricityJatibarang CJ

Feasibility Study Report and Preliminery Engineering Design for Landfill Closure, Landfill Gas Collection and Electricity Generation and Distribution, Jati Barang Landfill, Semarang, Central Java Province

Published: May 2015
Owner: ESP3
Author: Q2 A/S

Download Report
Download Appendixes

Pre-fs Klaten

Pre-feasibility study for Aren Palm Starch Waste Management Daleman and Pucang Miliran in Klaten District

Published: 2015
Owner: BLH Central Java and ESP3
Author: Hatfield Indonesia

Download report

wastepicker

Waste picking in municipal solid waste management systems in Central Java: Orientation and Recommendations

Published: 2015
Owner: MOEF and ESP3
Author: UNESCO-IHE and Springloop Cooperate U.A.

Download report

financialmodel

Cilacap Regency Refuse Derived Fuel Project: Financial Model Review

Published: 2015
Owner: MOEF and ESP3
Author: Deloitte

Download report

Pre-fs karimunjawa

Pre-feasibility study to determine the possibility of supporting sustainable electricity from renewable sources in the Karimunjawa Islands

Published: 2015
Owner: Dinas ESDM Central Java/ESP3
Author: Contained Energy

Download report

More Articles ...

FaLang translation system by Faboba